Online Building Permit Application
Click Here to apply for a Building Permit or Log in to your Existing Project
Apply for a building permit online any time of the day. You can now set up an account and follow your permit request throughout the permitting process. All documents must be uploaded as PDF files and named according to the pattern below. Please carefully review the naming pattern list below. The list below pertains mainly to new single-family dwellings. Any documents in the list that apply to the type of structure you are building are required. If you have questions about what documents are needed for the structure you are building, please call the office at 435-657-3200. A plan review will not take place until your submittal is complete.
Required Building Permit Plan Submission Naming Pattern
The above documents must be named as follows for each submittal/review cycle.
If they are not labeled correctly, your submittal will be rejected until the files are named accordingly.
File Type | File Name | Discipline | Sheet Type |
---|---|---|---|
Plans The file must be to scale and on either Arch D 24x36 or Arch E 48x36. It needs to include all architectural and structural sheets. Be sure the structural plans are stamped and signed by the Engineer of Record. | Complete Plan Set | Architectural | Plans |
Site Plan The site plan needs to be separate from your complete plan set. It needs to reflect distances to all property lines and other structures on the property. If the driveway is within a wildland fire area, it needs to reflect the width and slope. | Site Plan | Architectural | SitePlan |
Engineering | Structural Engineering Calcs | Structural | Structural Calculations |
Gas Line The gas schematic must reflect the requested meter size, pipe type, pipe lengths, and sizes, as well as the BTU/CFH load of all appliances. | Gas Schematic | Mechanical | Gas Schematic |
Manual J & D Heat Loss Use Logan or Vernal as the design location | Manual J & D-Heat Loss | Mechanical | Heat Loss Calculations |
ResCheck Signature Required. You must use the Utah Energy Conservation Code and pass by 5% or better. If you are using the prescriptive method, the prescriptive table must be on the cover sheet of your plans. | ResCheck-Signed | Energy | ResCheck |
Truss Package The truss package is no longer required with the permit application. A complete truss package must be submitted through the inspection portal prior to requesting a Roof Nailing inspection. The package needs to include a review letter from the Engineer of Record, a Truss Layout, and all Truss Sheets, which must be stamped by the truss manufacturer. | Truss Package Reviewed | Structural | Truss Package |
Propane Application* | Propane Application | Fire | Propane |
Wildland Hazard Severity Form* | Wildland Fire | Wild Land Fire | Fire Hazard Severity Form |
Landscape Plan | Landscape Plan | Wild Land Fire | Landscape Plan |
ICC Evaluation Reports* | ER (Report Number) | Architectural | Other |
Bid/Cost of Construction Not required on Single Family Dwellings | Bid-Cost of Construction | Forms | Bid-Cost Valuation |
Fireplace Specifications Fireplace specifications are not required at the time of application. However, they must be submitted through the inspection portal before requesting your 4-Way inspection. | Fireplace Specifications* | Mechanical | Other |
Soils Report | Soils Report | Structural | Other |
Home Owner Association* | HOA | Forms | HOA Packet |
Plan Review Response | Plan Review Response | Plan Review | Plan Review Comments |
Fire Sprinkler Plans* Fire Sprinkler plans and calculations must no longer be submitted with the permit application. If your structure requires fire sprinklers, these documents must be submitted through the inspection portal prior to requesting your Rough Sprinkler and 4-way inspection. | Complete Fire Sprinkler Plans | Fire | Sprinkler Plans |
Fire Sprinkler Calcs* Fire Sprinkler plans and calculations are not required to be submitted with the permit application. If your structure requires fire sprinklers, these documents must be submitted through the inspection portal prior to requesting your Rough Sprinkler and 4-way inspection. | Fire Sprinkler Calcs | Fire | Calculations |
Septic Permit Letter | Septic Permit | Forms | Septic Letter |
Property Owner Authorization | Property Owner Authorization | Forms | Property Owner Authorization |
* If Applicable
** Truss Package Reviewed file and Fire Sprinkler Plans and Calculations are no longer required to be submitted upfront. If applicable to your building structure, these documents must be submitted through our inspection software before requesting your Roof Nailing Inspection for the Truss Package and 4-Way for the Fire Sprinkler documents.
Important Information- Please Read and Understand
After you have completed the application and uploaded your documents, please be sure to click “SUBMIT FOR REVIEW.”
After submitting your application and documents, your submittal will be reviewed for completeness. If you are missing items needed for a complete submittal, you will get an email telling you what is still needed. Also, a link to pay the plan review fee will be in that email. The plan review fee is 65% of the building fee and will vary from project to project.
Any time you receive an email with items that need to be corrected, you must click the “SUBMIT FOR REVIEW” button after making the corrections. This is how we are notified that your submittal is ready for us to review. We don't have your project if you don’t submit it for review.
Once you receive your corrections and are ready to resubmit revisions, DO NOT DELETE any existing uploaded files. Label all new uploads per the above list so that a revision is reflected in the revision column instead of an additional document. Deleting documents may delete your plan review and hold up the issuance of your permit.
All uploaded documents must be in PDF format. Uploading documents of any other format will result in your application being returned as incomplete.
Click Here to apply for a Building Permit or Log in to your Existing Project